  • Bridge File 71190 on RGE RD 260 crossing the West Arrowwood Creek has now been completed.  The project involved replacing the single span concrete structure with two twin 2 meter culverts.
  • Bridge File 71191 WSW 24-17-26-4  Engineering Underway, Construction 2013
  • Bridge File 71947 SSE 14-17-26-4  Engineering Underway, Construction 2014
  • Bridge File 70968 WNW 15-16-26-4 Hydrology assessment underway.